Particle non-slip plastic track
Structural characteristics: The primer is a hybrid glue layer or a breathable (adhesive particle) glue layer. Spread a layer of 2-4mm polyurethane rubber particles or EPDM particles on the surface.
The particle non-slip plastic track is a typical plastic track in my country. It has been widely used in many sports projects at home and abroad. The production and construction technology are relatively mature. It is also the company’s main plastic track product. The surface particles are spread evenly after the glue layer is laid. Sprinkle a layer of particles, rely on the natural weight of the particles to sink into the glue layer, and form a bond with the glue layer of the glue layer. The excess part is collected by an appropriate method, reused, and a layer of glue is sprayed or rolled on the surface of the particles. Liquid, can well solve the threshing phenomenon of granular plastic track.
Breathable (spray granulation type and adhesive granule type) plastic track
Structural characteristics: The bottom glue is a breathable (adhesive particle) glue layer. The surface is sprayed 2-4mm with uniform and irregular unevenness of polyurethane rubber and particle mixed anti-skid layer or pavement with a layer of 3-5mm adhesive rubber particles.
Breathable rubber track adopts brand-new production and construction technology, and has made many major improvements from raw material formula to construction technology, and realized mechanized construction. Spray or pave a layer of high-quality glue and particles (or EPDM particles) mixed layer on the surface. Because the glue and particles are completely mixed in advance, the particles are completely covered by the glue to form a whole, which overcomes the random mixing of the particles and the glue layer. The shortcomings of local adhesion, stronger adhesion, coupled with special high-quality glue, the wear resistance of the surface layer is significantly improved.
Mechanized construction — The air-permeable plastic runway adopts mechanized construction from primer paving to spraying and marking. The construction speed is faster and the appearance is more beautiful.
Low basic requirements-due to the air-permeable structure, the moisture contained in the material can be smoothly discharged into the air, which completely solves the phenomenon of rubber layer bulging caused by the basic waterproof problem of non-air-permeable plastic paving.
Plastic tracks maintenance and maintenance
1. The plastic track is a venue for track and field training, competition and fitness exercise, and must not be used for other purposes.
2. The paving of the plastic track is completed, and it usually needs 7 days of maintenance (ambient temperature 15-30℃) before it can be used.
3. Vehicles cannot be driven on the plastic track, heavy objects cannot be piled for a long time, and sharp objects cannot be used.
4. Avoid contact with organic solvents, chemicals, cigarette butts and other fires, and isolate heat sources.
5. Keep it clean and clean with detergent if it is stained with oil.
6. After long-term use and sun aging, the marking line should be updated with similar paint in time when it is unclear or peeling off.
7. The maintenance of the plastic runway and marking line should be entrusted to an experienced construction team as far as possible.